A finishes 6/7th of the work in 2z hours, B works twice as fast and finishes the remaining work.
for how long did B work?
ajit can do as much work as in 2 days as baljit can do in 3 days and baljit can do as much as in 4 days as diljit in 5 days.
a piece of work takes 20 days if they all work together.
how many days will baljit take to complete it alone?
two pipes can fill a cistern in 14 and 16 hours repectively.
the pipes are opened simultaneously and it was found that due to leakage it takes 32 minutes more to fill up.
when the cistern is full, in what time the leakage will empty it?
x takes 4 days to complete 1/3rd of the job,
y takes 3 days to complete 1/6th of the job,
and z takes 5 days to complete half the job.
if all of them work for 3 days and X and Z quit
then how long will it take Y to complete the remaining job?
a tank of 4800mcube capacity is full of water.
the discharging capacity of the pump is 10m^3/min higher than its filling capacity.
as a result the pump needs 16 mins less to discharge then to fill up the tank.
find the filling capacity of the tank?
p.s- this is it
clerkwalo apni gk,computer,reasoning aur english ki bhi practice kar lo. i think quant ki toh kaafi ho gyi hai.isse upar level nahi hona chahiye.
give ur views @sbaaz @krishna_17
ibps ne aisa jakham diya jo na ab bharega har ibps paper se ab yeh candidate darega
€‹any one know what was the average score in clerk last year and marks to get selected (safe score)? tia
Venn diagram ques below (reasoning)-
Venn Diagram Ques Below
is difficulty level of clerical same as po or little less than it .....
Kaha ho sab ke sab.... ???? Movie dekh rhe ho kya group mein ??????
Anyone from Electronics and Instrumentation Engineering?????
Sanjay went 70 metres in the East before turning to his right. He went 10 metres before turning to his right again and went 10 metres from this point. From here he went 90 metres to the North. How far was he from the starting point ?
A watch reads 4.30 if the minute hand points east, in what direction does the hour hand point?
If 34 men completed 2/5th of a work in 8 days working 9 hours a day. How many more man should be engaged to finish the rest of the work in 6 days working 9 hours a day?
A train M leaves Meerat at 5 am and reaches Delhi at 9am . Another train N leaves Delhi at 7am and reaches Meerut at 1030am At what time do the 2 trains cross one Another
In a certain code language CROWNED is written as PSDVEFO. How will STREAMS be written in the same code ?